Skip to content
UNISON
Request a walkthrough 855-835-0835

How it works

From walkthrough to first shift.

Four steps to start, then a fifth that never ends. Nothing here is a sales stage — each one produces a document you keep.

Request a walkthrough 855-835-0835

The steps

Five stages, five documents.

  1. Walkthrough

    About thirty minutes on site with whoever manages the property. We are measuring and counting, not selling — the questions are about traffic, access, and what has been going wrong.

    • Areas measured, fixtures and restrooms counted
    • Access, keys, alarms, and dock or elevator constraints noted
    • Current condition recorded against what you expect it to be

    You receive

    Site notes and measurements

    Usually scheduled within 4 hours

  2. Written scope & pricing

    Room by room, task by task, with a frequency against each line and a price built on that scope rather than a square-foot rule of thumb.

    • Every task and its frequency listed in writing
    • Consumables, equipment, and exclusions stated explicitly
    • Cadence options priced separately so you can compare them

    You receive

    Scope of work and price

    Returned after the walkthrough

  3. Onboarding

    Before the first shift: the crew is named, screened, and trained on your specific scope; keys and codes are logged to individuals; certificates go to your landlord if the lease needs them.

    • Named supervisor and named crew assigned to your site
    • Site-specific training on your written scope, not a generic induction
    • Keys, badges, and alarm codes issued and logged by name

    You receive

    Start date, crew roster, access log

    Agreed at signing

  4. First shifts

    The supervisor is on site for the early shifts. Anything the walkthrough missed gets caught here and written into the scope rather than absorbed silently or billed as an extra.

    • Supervisor present for the first shifts, not just reachable
    • Scope amendments made in writing where reality differs
    • A condition baseline recorded so later drift is visible

    You receive

    Opening condition record

    First two weeks

  5. Supervision & inspection

    This is the part that does not end. Scheduled walks against the written scope, a record for each one, and corrections raised and closed on paper with a name and a date.

    • Inspections happen on schedule whether or not you have complained
    • Corrections closed in writing when you confirm, not when we assume
    • Scope reviewed as the building changes — new tenant, new hours, new use

    You receive

    Inspection records and closed corrections

    Ongoing, on a set cycle

Switching vendors

Changing over without an uncovered night.

Most of our work starts as somebody else's contract ending. The transition is scheduled backwards from your notice date so the last night of the old program and the first night of ours are consecutive, not overlapping and not separated by a gap.

  • We work backwards from your notice date so there is no uncovered night.
  • Your existing vendor keeps their final shifts; we do not shadow or undercut them on site.
  • Key and access handover is scheduled as a specific task with a named person on each side.
  • The first inspection is deliberately early, because the gap between the old standard and the written one is widest in week one.

Start with the walkthrough.

Thirty minutes on site, no obligation, and a written scope at the end of it.

Request a walkthrough 855-835-0835
Call 855-835-0835 Request a walkthrough